top of page
View Collection

FALL 2023

COMMITTED
TO 
QUALITY

True value comes from customer satisfaction. We are commitment to values includes overall responsibility; quality and outstanding performance. 

Our Core Values

Integrity

Performance

Innovation

Anchor 1

Our Process

RECEIVABLE

Parts or Tools are received at our shipping department and the package is carefully inspected.

COATING CHAMBER

It's ready for coating, the operator will inspected the paperwork before its placed in a chamber. 

INSPECTION

All items are inspected for damage, Also items are reviewed along with the purchase order to assure our paperwork is correct. 

 

INSPECTION

All items are inspected for quality assurance. This last inspection must meet all internal passing requirements. 

CLEANING/INSPECTION

All items are inspected in the cleaning line. Since this department is the so critical to the coating process, it must pass.

SHIP BACK TO CUSTOMER

All Parts or tools are counted and  are packaged either dipped in wax, wrapped in paper or in tubes. 

Carbon

.

.

.

Nitrogen

.

.

.

PRODUCING VAPOR TO CREATE A NEW

COATING ELEMENT

Aluminium

.

.

.

Titanium

.

.

.

INNOVATIVE SOLUTIONS.

COATING PROCESS.

Solid Carbide
End Mill (Example)

Protected Layer
of Coating, allowing

the tool to last longer

Unprotected
Base Material

Smooth Thin-Layer
Finish, with extreme wear resistance

 

INSPECTION

QUALITY 

Element will inspect material and components before production begins, to assure quality.

3 STEP PROCESS

Before Production Inspection

Cleaning Inspection

Post-Coating Inspection

bottom of page